Dignity
People must be treated as human beings, not statistics, nuisances, political props, or problems to be moved.
The Living Futures Center · Full Presentation
When the answer is “there is nowhere to take them,” that is the gap this proposal is trying to solve. The first decision is not to approve a building. It is whether London should formally test what is missing, what already works, and whether London can connect stabilization, treatment, recovery, supportive housing, work and independent living into one clear route, with someone responsible at each step.
After the police call, ambulance ride, outreach visit or shelter bed — what is the next real place? London already has many of the pieces. Living Futures asks whether we can connect them, make every handoff somebody’s responsibility and keep independence as the destination.
PROPOSAL UNDER PUBLIC REVIEW
Campaign concept for public review. Nothing has been approved: no site, operator, partner, funding or construction timeline. The first question is whether London should study the idea properly.
Three-minute decision brief
What this is
A proposal to test whether London can connect crisis stabilization, treatment and recovery, supportive housing and independent living more effectively — and whether that should happen on one campus, through a network or through a mix of both.
What happens first
Not construction. First, test the need, how it could operate, where it could go, who would have to be involved, what it could cost to build and run, and which government would pay for what.
What would count as progress
A public case people can challenge: realistic costs, clear responsibilities, how it could operate, what a suitable site would require, measurable results and a Council decision before anything permanent moves ahead.
What this is not
It is not approval for a 1,000-bed shelter, a chosen site, a selected operator, a construction budget or a promise that one building will solve homelessness. The 1,000+ figure later in this deck is a long-term planning scenario to test — not an approved target.
The model question is still open
Before choosing a model, compare at least three options on the same facts: results, staffing, build and operating costs, transportation, neighbourhood impact, room to grow and how well people are connected to permanent housing and independent living.
Coordinated center model
Put more services and housing functions at one main site. The question is whether easier handoffs between services are worth the land, scale, transportation and neighbourhood impacts.
Distributed network model
Keep services spread across multiple sites, but connect them through clearer referrals, shared responsibility and one public way to report results. The question is whether coordination can improve without a large central site.
Hybrid model
Use a smaller 24/7 stabilization hub connected to treatment, supportive housing and independent homes across the city. The question is whether this keeps the benefits of coordinated services without putting everything in one place.
Rights and safeguards belong in the feasibility test
Any future model should be tested against clear safeguards before it advances: voluntary participation except where existing law provides otherwise; privacy and informed consent; accessibility; a clear complaints and review process; separation of housing rights from treatment compliance where legally required; culturally appropriate and Indigenous-led pathways where applicable; and public reporting that measures outcomes without exposing personal information.
The Crisis
The public record shows a difficult picture: homelessness has risen sharply even as some opioid-harm indicators improved from their 2021 peak. Acute spikes still happen. The question Living Futures puts on the table is not whether London cares. It is whether housing, health, stabilization, recovery and public-safety responses connect well enough to help people move out of repeated crisis and toward a stable life.
people experienced homelessness in London in 2024–25.
That is up 18.3% from 2022–23.16 The number establishes the scale. The rest of this presentation is about what London can do with that reality.
The point
These measures describe different pressures, not one interchangeable statistic. The point is the pattern: repeated crisis becomes the system. Living Futures is built around a different sequence — stabilize, connect, house, support recovery, build skills where appropriate, and keep responsibility attached to the next step.
The Economic Question
Homelessness places real demands on shelters, healthcare, emergency response and other public systems. That does not prove that this Center would save a particular dollar amount. A formal business case would have to compare a phased Center model with existing approaches using current London data.
London’s evaluation of highly supportive housing reports encouraging early outcomes, including reduced reliance on emergency services for some residents, while also emphasizing the need for continued evaluation and sustained operating investment.1 That evidence supports examining coordinated housing and supports. It is not a forecast of what an unbuilt Center would achieve.
Measure outcomes first. Do not promise savings before the operating model and business case exist.
The feasibility process should establish the baseline, methodology and reporting standard before any claimed financial benefit is published.
Why the pieces have to connect
Canada-wide homelessness survey data help explain why a housing response cannot be designed in isolation: 74% of respondents reported mental-health and/or substance-use issues, and 47% reported both.18
Among people experiencing chronic homelessness, 64% reported substance-use issues, compared with 54% among those who were not chronically homeless.18 These are Canada-wide survey results, not London-specific rates. They are included only to show why housing, treatment, recovery, stabilization and public safety have to connect rather than operate as separate referral lists.
The Idea
Living Futures is not one enormous shelter and it is not a proposal to duplicate services London already has. London already has shelters, Hubs, outreach, health care, treatment, recovery, supportive housing and a new Housing Stability Action Plan. The question is whether people are still falling through gaps between those systems — and whether those gaps can be fixed by stronger handoffs, expanded existing services or, only where evidence supports it, new capacity.
The pathway — connected steps from crisis to a stable life
Right person. Right level of care. Somewhere real to go. A person in acute crisis, somebody ready for treatment, and somebody ready to move into housing do not need the same intervention. The pathway has to match the response to the need and keep a real next step in view.
The destination is not the center. The destination is independence. For one person that next step may be treatment. For another it may be supportive housing, an accessible apartment, training, work, reconnection with family or permanent housing elsewhere in the community. Housing navigation, stabilization, treatment and recovery connections, health and social supports, skills and employment pathways, and appropriate community partners could be organized around one people-facing pathway. Every part would carry a named operator, a service standard and public reporting, so London can see whether the whole path is working, not just whether a building opened.
One center does not mean one organization does everything
Provincial health funding, federal housing programs, municipal contributions, philanthropy and provider funding have different rules. The proposal is to coordinate them, not pretend they become one pot of money: map who funds what, identify gaps and duplication, assign responsibility, and show publicly what each funded component is supposed to deliver. London’s Official Plan already encourages co-located public facilities and partnerships where appropriate to support efficient, integrated public services.19
The Standards
The point is not simply to move people indoors or move a problem somewhere else. Any version of Living Futures would have to connect safety, housing, health, recovery, responsibility and a real next step — and then show the public whether it is working.
A person is not a statistic, a nuisance, a political prop, or a problem to be moved.
The first standard is dignity. The next is delivery: a system that knows what the next step is, who owns it, and whether it actually happened.People must be treated as human beings, not statistics, nuisances, political props, or problems to be moved.
Temporary shelter is not the final result. The system must create pathways from stabilization and supportive housing toward permanent and independent living wherever that is appropriate for the individual.
People need a voluntary place to access nursing, primary care, mental-health and addiction care, withdrawal-management assessment and recovery support without treating a hospital emergency department as the only front door. Emergency and specialist care must still transfer to the appropriate hospital or health service.
Safety standards must apply to participants, workers, nearby residents, local businesses, visitors, and the surrounding community.
Every funded service needs a named operator, a clear authority, a service standard, a reporting requirement and a process for fixing failures.
The proposal must connect 24/7 access, stabilization, health care, withdrawal management where needed, treatment and recovery, supportive housing, income support, skills, employment and permanent housing — with a clear next step instead of leaving people to navigate disconnected programs alone.
London already has Hubs, highly supportive housing, outreach, health partners and a new Housing Stability Action Plan. Living Futures has to prove what gap remains, what connection is failing and what additional capacity is actually needed before new infrastructure is justified.
Programs must be measured by results, not announcements, press conferences, temporary openings, or money spent alone. Housing exits, housing retention, service access and repeat-system use should be visible where lawful and available.
The public must be able to see what was promised, what was funded, who was responsible, what happened, what remains unresolved, and what changes are required.
Build From What Exists Here
Ontario’s HART framework and London’s own system already connect treatment, mental-health care, primary care, housing, income and employment supports. Ontario’s Big City Mayors is also calling for recovery-based treatment, supportive housing and stronger provincial participation through its 2026 Solve the Crisis — Reaction to Recovery campaign.5,6,20 Living Futures starts there: identify where London’s pathways still break, then connect or expand what is missing instead of duplicating what already works.
A larger Ontario direction — not an endorsement of this proposal
Ontario’s Big City Mayors is calling for expanded voluntary recovery-based treatment, supportive housing capacity, HART Hub expansion and coordinated provincial action with municipalities and community partners.20 That does not mean OBCM has endorsed, funded or designed Living Futures. It does show that the central problem this proposal is trying to solve — disconnected housing, treatment, recovery and municipal crisis response — is being identified across Ontario’s largest cities.
A made-in-Ontario pathway already exists to build from.
HART Hubs can connect withdrawal management, addiction treatment, mental-health and primary care, social assistance, employment services, transitional beds and supportive housing.5
The proposal should not create a parallel bureaucracy. A feasibility process should map London’s existing HART Hub, Hubs, highly supportive housing, health care, Ontario Works and Employment Ontario pathways; identify wait-list, handoff and capacity failures; and recommend only the missing links that require expansion, co-location or new capacity.5,6,9
The Pieces Already Exist
Supportive housing, Hubs, experienced service providers and funding programs are already operating or developing here. Before proposing new capacity, Living Futures would count those assets, identify the missing links and test whether co-location or stronger handoffs would actually improve the path to stable housing and recovery.
highly supportive housing units are open, in development, or in endorsed proposals seeking funding toward London’s 600-unit goal.
That existing pipeline has to be counted before any additional Living Futures capacity is proposed.9
What these numbers mean
They show that London already has housing work, service capacity, public funding agreements and community fundraising in motion. They do not mean those dollars or programs are available to Living Futures. A feasibility report would have to identify what is actually eligible, what is already committed elsewhere and what gaps remain.
London has an $81.4-million Housing Accelerator Fund agreement, while the community’s Health & Homelessness Fund for Change reports $37.6 million raised.8,11 Those figures demonstrate existing housing and philanthropic activity; they are not presented as money committed or available to a Living Futures Center.
Do not build a parallel system
London does not need another disconnected ecosystem. LHSC and St. Joseph’s / Parkwood anchor clinical care; CMHA Thames Valley runs the HART Hub; Atlohsa leads Indigenous healing; and Mission Services, Unity Project, YOU, LIHC and London Cares deliver frontline services across London. A Living Futures model would have to show exactly what it connects, what it expands and what gap remains before any new building is justified.
Partner names identify roles in the system only. No endorsement, partnership, or commitment by any organization is claimed.
The Phased Vision
The long-term concept could potentially grow to serve 1,000+ people across multiple buildings, housing types and levels of support — but only if demonstrated need, outcomes, land, infrastructure, funding and operating feasibility justify that scale. The first decision is not how many buildings to construct. It is what London is missing, what already exists, and what scale can be staffed, funded and expanded responsibly.
Long-term planning scenario — not an approved capacity or construction target; exact scale and housing mix remain subject to feasibility, funding, health-system participation and Council approval
This is not a proposal for a 1,000-bed shelter or a single institution. It is a proposal to test a mixed community: smaller residential buildings and accessible homes, supportive and transitional housing, independent affordable homes, green and community space, and a central health-and-service hub. London’s existing supportive-housing pipeline must be counted first: the City reports 169 units open and 422 open, in development, or in endorsed proposals seeking funding toward its existing 600-unit goal.9
Build for growth without overbuilding blindly
Choose a site and servicing plan that can grow if demand supports it. Open in workable phases, publish results and expand without forcing London to abandon the site and start over. Capacity decisions should use verified housing need, service demand, staffing, treatment access, housing exits and the existing housing pipeline.
What people should be able to get here
How It Could Be Paid For
There is no approved Center budget and no committed funding package. Feasibility should separate housing construction, health care, homelessness supports, employment services, site infrastructure and ongoing operations — then confirm which current programs are actually eligible for each piece.
Possible funding responsibilities for feasibility testing — not a Center budget or commitment
A real operating plan has to answer
No opening phase should depend on an unidentified operating subsidy.
Who Would Have to Be Involved
The City can lead the housing, planning and coordination work. It cannot deliver every part itself. Health care, treatment, housing finance, operations, employment supports and Indigenous-led services require the organizations that actually hold those responsibilities. No organization is presented as committed.
London is the Service Manager for London and Middlesex. It leads local housing-stability planning and also controls municipal planning, servicing and local budget decisions.
Council decides motions, municipal budgets, land decisions and other matters that legally come before it.
Clinical care, mental-health and addiction treatment require provincial authority, health-system participation and qualified providers.
Federal, provincial and municipal housing programs can be tested where the project meets their current eligibility rules.
Ontario Works and Employment Ontario can connect eligible people to income, assessment, training, job search, placement and retention supports.
Housing and service operators would need defined responsibilities, staffing standards, performance measures and funding.
Indigenous homelessness and housing responses should be designed and led with Indigenous organizations, consistent with London’s current housing plan.
Consultation should address site design, access, transportation, safety, neighbourhood impacts and ongoing reporting.
No organization listed here is presented as having agreed to participate, and no operator has been selected.
Where It Could Go
There is no chosen location. A credible site has to survive the service, planning, transportation, servicing, safety, neighbourhood and cost questions first. The proposal therefore publishes the criteria before the pin on the map.
Criteria for study — not a chosen location
Site standard
Room to grow in phases
Space for a first phase and later ones — whether that is land to build on or a large existing building the public already owns and could adapt.
Site standard
Already serviced
Water, sewer, power and transit at the door, so the money and the time go into people, not trenches.
Site standard
Close to care
Within reach of hospitals, clinics and the services residents already rely on.
Site standard
The right property
Compare public land, adaptive reuse, nonprofit or partner land and new construction on the same acquisition cost, readiness, servicing, location and public-value tests.
Site standard
Fits its surroundings
Zoning that can realistically work, with genuine neighbour and business consultation built in from day one.
Site standard
Serves the region
London and the surrounding area share this crisis — the site should serve that whole catchment, not just one ward.
Why a standard first, not a pin on a map
Some of the strongest campuses reuse what a city already owns — a surplus building, an underused institutional site — instead of building from nothing. Which of those fits London is exactly what a feasibility study exists to answer. Publish the standard first and the address only after the study, and this gets done right instead of fast.
The Honest Part
No site, operator, final housing mix, clinical model, capacity, budget or funding package has been approved. A feasibility process has to answer those questions publicly before Council is asked to consider a real project.
What this evidence does not establish
The evidence here — Ontario’s HART framework, At Home/Chez Soi and London’s House of Hope evaluation — shows that coordinated treatment and well-supported housing can improve stability for people with complex needs. They are a reason to evaluate this model seriously. They are not a forecast for a campus that has no approved site, operator, budget, or opening date.
How This Actually Moves
If elected, I would ask Council to start with the existing system: map capacity, funding and current plans; identify handoff failures and unmet demand; test whether existing services can be connected or expanded; and only then examine new infrastructure, site criteria and cost. If the evidence does not show a real gap or a workable operating model, the proposal changes — or stops.
Proposed motion direction
That Civic Administration report back on options for a coordinated Living Futures Center model for recovery, housing and pathways to independent living for London, including:
Final motion wording must be reviewed against Council procedure, legislative authority, and verified staff information before submission.
Reported publicly at every milestone
First 30 Days
Within the first 30 days, if elected, I would start the public work needed to find out whether this idea can actually move through Council.
First 60 Days
By 60 days, the public should know what information already exists, what is missing and what additional legal, financial, planning or service work is required.
First 90 Days
By 90 days, the public should be able to see whether the proposal is advancing, delayed, redirected, or blocked.
First 100 Days
By 100 days, there should be a public answer — not another vague statement.
How Progress Is Reported
No blank cheque. No building first and questions later. Accountability starts with the gap we are trying to solve, the body responsible, the cost, the deadline and the result.
Publish the major decisions, costs, timelines, responsibilities and results. Report delays as well as progress. Separate verified system data from proposed Center targets, and update the public when assumptions change.
BISSON13 · Ward 13 · October 26, 2026
Real Problems Real Solutions Real Results
Connect what already exists. Fill the gaps that are real. Build only what the evidence supports. Then measure the results and report them publicly.
Produced, developed, researched, and presented by Schelley Bisson.
“Living Futures Center” is a working name for a proposed model under public review — not an approved, funded, sited, or operated project.
Sources
Crisis, existing-system, and precedent figures are verified and dated. Figures about the proposed Center itself are labelled illustrative or drawn from comparable builds — never asserted as a plan.